top of page

The Full Story

About

The Black Box is a highly sensitive fire data logging sensor incorporating a photoelectric sensor, smoke sensor and temperature sensor to provide data on the fire at the time of the fire after it has been extinguished.

著火
著火

Detail

Specific internal use

The Black Box is an advanced fire data logging sensor that integrates temperature and smoke sensors in a rugged, lightweight design utilizing high-strength, lightweight materials and a multi-layer protective construction to provide early detection and reliable data storage under extreme fire conditions and can operate in fire-roasted conditions for five to ten minutes.

Detailed structure diagram

Internal composition

The arrows in the diagram indicate the connections. Each part in this product is connected to each other and ultimately to the hard disk, ensuring that all video data and environmental data detected will be transferred to the hard disk and saved.

Screen Shot 2024-08-17 at 7.15.43 AM.png

How it work?

Step one:

Fire is detected by smoke alarms and temperature alarms, and the alarm is raised after both alarms have reached their values, improving the accuracy of the alarm. Also remind the user after the alarm.

Step two:

After the alarm of both alarms, the camera starts to work, the temperature and smoke start to record, the temperature is recorded every second, the smoke is recorded every 0.5 seconds, and at the same time, the picture is taken every second.

Step three:

The fireproof USB flash drive records the data until the fire stops or the alarms stop working.

History and the timeline

March 18, 2024

Because the fire alarms in your home go off because of cooking and shower water vapor, think about what changes you can make to make them more accurate.

May to July, 2024

Through a series of researches, knowing the problems of the traditional fire alarms and the points that can be improved, we started to design a new type of alarm and build a website.

September, 2024

Conduct simple tests to identify product issues and make improvements

January-February 2025

Final testing and production of samples and products

May-June 2025

Advertise on linkedin, contact schools to inquire about installation, and finalize testing

April 18, 2024

Establish innovative and transformative ideas, create a blueprint for the program, and formally begin studying and researching.

August, 2024

Modeling products, improving the website and do Patent application

November to December 2024

Continuing to improve the product, designing a new look, updating the website​

March-April 2025

Prepare for field installation testing and promotional outreach.

July 2025

First installations and more publicity, we almost done!

We'll keep the schedule updated!